     50-60-606. Power supplier to deliver inspection tag to department after installation energized. Immediately after an installation has been energized, the power supplier shall deliver to the department of commerce the inspection tag covering the installation.

     History: En. 66-2805.1 by Sec. 273, Ch. 350, L. 1974; amd. Sec. 9, Ch. 504, L. 1977; R.C.M. 1947, 66-2805.1(3); amd. Sec. 18, Ch. 352, L. 1985.